71 • Calibrating a GX-2012
11. After air is applied, and if all the channels passed the zero adjustment,
calibration gas will be applied. The GAS 1 indicator on the program screen will
come on. Calibration gas will be applied to the instrument(s) for 90 seconds.
Figure 53: GAS 1 Calibration Gas Flowing
The PC Controller Program will analyze the results.