Rki-instruments SDM-2009 PC Controlled Configuration Manuale Utente Pagina 56

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 55
51 • Bump Testing a GX-2009
If the bump test fails and the Force Calibration box was not selected, the
following window will open indicating which channels failed the bump test.
The BUMP T LED on the SDM-2009 control panel will be solid red. Click
OK to return to the main program window or double click the instrument
information line to view the bump test results in the Logs window. The
BUMP T LED on the SDM-2009 control panel will turn off.
Figure 37: Bump Test Failed
Vedere la pagina 55
1 2 ... 51 52 53 54 55 56 57 58 59 60 61 ... 113 114

Commenti su questo manuale

Nessun commento